Forum / News / East Anglian LC improvements.
Reply Subscribe Start new thread Syndicated Feed (RSS)
Displaying 1 to 1 of 1 | Previous 1 Next |
Author | Message | ||
---|---|---|---|
8001F
Posts: 5529 Location: |
Upgrade of signalling control equipment at Cambridge power signal box (PSB) Upgrade of signalling systems with a modern, computer-based digital system Relocation of signalling control from the Bury St Edmunds, Dullingham and Chippenham signal boxes to the Cambridge PSB Upgrade of telecommunications and power supplies to support the new systems Upgrade of seven level crossings to full barrier with obstacle detection or CCTV technology.These are at Meldreth Road (Hitchin-Cambridge), Milton Fen, Waterbeach, Dimmocks Cote (Cambridge-Ely), Six Mile Bottom, and Dullingham (Cambridge-Newmarket) and Croxton level crossing in Norfolk. The latter has had a TSR for several years due to sighting issues. The work is expected to begin by the early part of 2022 and is currently planned to be complete by 2025. NR 16.02.2021 |
||
Back to top | View user profile Contact this member |