Railway Performance Society Magazine - Milepost

East Anglian LC improvements.

Forum / News / East Anglian LC improvements.

Reply         Subscribe         Start new thread         Syndicated Feed (RSS)        

Displaying 1 to 1 of 1 Previous   1   Next
Author Message
8001F

Posts: 5529
Location:
East Anglian LC improvements. - Posted: February 16, 2021 - 5:35 PM Quote and reply
Network Rail propose:
Upgrade of signalling control equipment at Cambridge power signal box (PSB)
Upgrade of signalling systems with a modern, computer-based digital system
Relocation of signalling control from the Bury St Edmunds, Dullingham and Chippenham signal boxes to the Cambridge PSB
Upgrade of telecommunications and power supplies to support the new systems
Upgrade of seven level crossings to full barrier with obstacle detection or CCTV technology.These are at Meldreth Road (Hitchin-Cambridge), Milton Fen, Waterbeach, Dimmocks Cote (Cambridge-Ely), Six Mile Bottom, and Dullingham (Cambridge-Newmarket) and Croxton level crossing in Norfolk. The latter has had a TSR for several years due to sighting issues.

The work is expected to begin by the early part of 2022 and is currently planned to be complete by 2025.
NR 16.02.2021


Back to top View user profile     Contact this member