Forum / News / Whitby cut off.
Reply Subscribe Start new thread Syndicated Feed (RSS)
Displaying 1 to 1 of 1 | Previous 1 Next |
Author | Message | ||
---|---|---|---|
8001F
Posts: 5560 Location: |
Engineers are currently on site assessing damage caused by a collapsed drainage culvert and putting plans in place for the recovery of the line. The line is likely to remain closed until early next week while engineers repair the void under the railway created by the collapsed culvert and then relay the track above. NR 02.05.16 |
||
Back to top | View user profile Contact this member |