Railway Performance Society Magazine - Milepost

Stromeferry joint rail/road trackbed again.

Forum / News / Stromeferry joint rail/road trackbed again.

Reply         Subscribe         Start new thread         Syndicated Feed (RSS)        

Displaying 1 to 1 of 1 Previous   1   Next
Author Message
8001F

Posts: 5560
Location:
Stromeferry joint rail/road trackbed again. - Posted: August 6, 2018 - 1:54 PM Quote and reply
A ROAD closure timetable has been released ahead of major roadworks on the Stromeferry bypass – and motorists have been urged to study its time slots closely so they don’t get caught out when work begins this September.
Work on the rock face to the west of the rockfall shelter will get underway on September 3 and could last for up to three months.
During that period a road-rail bypass system will be in force on the A890, with vehicles directed onto a temporary road surface on the neighbouring rail track (Kyle Line) to get around the works.
But this means there will be frequent closures each day to enable trains to pass through.
Press & Journal

Back to top View user profile     Contact this member